How to Run Divers Clipped on With Long Leads
Category: fishing tips
Jul 29th, 2019 by Keith Worrall
Modified Jul 29th, 2019 at 10:35 AM
Ok guys here is a video on how I run my divers clipped on so I can run long leads..
My braid divers are 40lb braid with 40′ of 30lb fluorocarbon leader so I don’t run snubbers with them..
My wire divers are 7 strand Torpedo wire with 100′ of 40lb braid tied to them so I can clip the divers on.. I run a snubber on these setups just ahead of the spin doctor or paddle.. If I have a spoon on it I add a 6′ leader after the snubber to the spoon..
I should have added I can take no credit for coming up with this.. This technique was shown to me by Yvan Charrois of Get it Wet sportfishing
https://www.facebook.com/groups/1364672780212116/permalink/2639918549354193/
